Blog
»

Construction Alert: Alcoa Dike Project Update

January 29, 2024
Both Rincon Street and Butterfield Connector have been opened

Following the successful completion of the final construction punch list for Rincon Street and Butterfield Connector, as well as the formalization of road easements between the City of Corona and the United States Army Corps of Engineers (USACE), both Rincon Street and Butterfield Connector are now open as of the morning of January 29, 2024.

As part of the ongoing USACE dike project, the next phase involves the permanent closure of the old Butterfield Drive road, scheduled for January 29, 2024. For those heading to the airport, the new recommended route is to take Rincon Street to the recently opened Butterfield Connector, providing a smoother path to your destination. Check out the attached detour map for guidance.

Click here to view reference map.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Share this post

Stay Connected with your City!

Keep up with the latest news and updates!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.